Gas Pipe and Soil and Waste Pipe Installation
This job was on four luxury homes that had taken 2 weeks to complete, the job spec was to fit temporary and fixed gas supply (piping only) and all 110mm soil pipes and waste then fixing the the mains to the homes and commissioning.